Tasks

Go to: Projects → Task, or open a Project and select Tasks

Tasks can stand alone, belong to a project, sit below a group task, depend on other tasks, and carry their own assignee, schedule, progress, and timesheets.

Create a task

Enter the work

Click Create Task and enter the required Subject. Select a Project and Priority if applicable.

Choose the task shape

Turn on Group Task for a parent/container task, or Task Template for reusable work. A normal task can be linked to a parent group.

Select Task Type. If that type has a Document Type, normal non-group tasks also show Linked Document.

Plan the schedule

Choose Absolute Dates or Relative to Project Start. Add progress, weight, milestone, reminder, and actual values as appropriate.

Add dependencies and save

Use the Dependencies tab to select prerequisite tasks, then save. Use Assign on the saved task to choose its owner.

Task fields

AreaFieldMeaning
BasicSubjectRequired task name
ProjectOptional parent project; hidden for task templates
PriorityLow, Medium, or High
Group TaskMakes this a parent task
Task TemplateMakes this reusable rather than live project work
ClassificationTask TypeWork category and optional document automation
Linked DocumentAppears when the Task Type specifies a Document Type
PlanningSchedule ModeAbsolute Dates or Relative to Project Start
Expected Start / Expected EndPlanned dates in Absolute mode
Begin On Days / Duration (Days)Offset and length in Relative mode
Task WeightUsed by project Task Weight progress
Is MilestoneMarks an important schedule point
TrackingActual Start DateWhen work really started
Completed OnRequired for Completed; available for Cancelled
Actual TimeHours spent entered on the task
Progress0–100; completion presents as 100
StructureParent Task (Group)Places the task below a group task
Follow-upRemind MeLocal date/time reminder, at least 30 minutes ahead and within task dates
DetailDescriptionInstructions, outcome, or acceptance notes

Selecting a task on a timesheet can derive its project automatically. The task must be assigned to the timesheet employee’s user account.

For schedule changes across the whole project, use Gantt Charts. For time recorded against a task, see Timesheets.

Task statuses and allowed moves

StatusMeaningNormal next moves
DraftNot releasedOpen or Cancelled
OpenReady to workWorking, Completed, or Cancelled
WorkingIn progressOpen, Completed, or Cancelled
CompletedFinishedWorking
CancelledStoppedOpen
OverdueSystem-maintained late taskOpen, Working, Completed, or Cancelled

Completing directly from Open requires an Actual Start Date. Completed also records Completed On. Task templates do not follow live-task status changes.

In everyday use, save unfinished preparation as Draft, move it to Open when it is ready, and use Working while work is in progress. Mark it Completed when finished or Cancelled if it will not continue. ERPX marks late tasks Overdue automatically. Reopening options are available when work needs to resume.

Dependencies

Open the task’s Dependencies tab.

  • Depends On lists prerequisites that must come first.
  • Blocking Tasks lists tasks that depend on the current task.
  • Click Add Dependency, choose a task, and save.
  • Use the row action to remove a dependency, or Clear Table before saving.

ERPX rejects self-dependencies, duplicates, circular chains, cross-project mismatches, and ordering that puts a dependent task before its prerequisite.

A dependency is a schedule and sequencing rule. It does not hide the dependent task from every view. Use the status and dependency graph to judge readiness.

Timesheets tab

On a saved, non-template task, Timesheets shows linked entries with Document Number, Employee, Date, Hours, and Status. Open a row to review the timesheet.

Project task views

Open a saved Project and choose Tasks.

ViewBest forWhat you can do
List / Table ViewDetailed maintenanceReview task details, reorder, link or unlink, and use bulk actions
Kanban ViewStatus-based daily workSee cards by status and move eligible tasks
Task Dependency GraphUnderstanding task orderFollow dependency lines and inspect hierarchy, status, priority, and progress

List view

Select rows and open Actions to mark eligible tasks Open, Working, Completed, or Cancelled; duplicate; delete; unlink; or bulk-edit Project and planned dates. Skipped rows are reported.

Use Link Task to attach an existing unlinked task. Unlinking removes the project relationship without deleting the task.

Drag rows to reorder them. ERPX blocks positions that violate group hierarchy or dependency order.

Kanban view

Columns represent Draft, Open, Working, Completed, Cancelled, and Overdue. Cards show key task details. Move a card only to a status allowed by the task workflow.

Dependency Graph

Arrows show prerequisite order. Use zoom in, zoom out, and reset for large plans. Add or remove relationships on the task’s Dependencies tab.